METZGER/McGUIRE Products
Crack Repair Cartridges

Rapid Refloor Pit Grout
Repair Concrete Floor ImperfectionsProduct Quantity | 1500 ml |
Colours | Dovetail (68 Special Order Colours) |
Working Time | 3-4 Minutes |
Pot Life | 1-1.5 Minutes In Nozzle |
Dry Time | 15 Minutes TF | 45 Minutes Grind |
SF Or LF | 175-300 LF |
Area Or Depth | /unit |
Floor Or Wall | Floors |
Interior or Exterior | Interior |
Compressive Strength (PSI) | 3550 |
Tensile Strength | 1500 |
Shore Hardness | D70-75 |
TF | Tack Free |
RC | Recoat |
FT | Foot Traffic |
LT | Light Traffic |
DT | Dry Through |
FC | Full Cure |
-
Rapid-set formula allows for quick access to floor areas and grinding as early as 45 minutes after application
-
Low-viscosity allows for penetration into very small, micro-level surface pits and imperfections
-
Yields a smoother, denser floor surface
-
100% solids, minimal odour formula. Use only in well ventilated areas
-
Aggregate can be broadcast onto material surface but must be done immediately after placement and prior to initial set time (approximately 3 minutes at 70°F)
-
Depending upon surface conditions and/or environmental conditions, more than one coat of product may be required
-
Rapid Refloor Pit Grout may exhibit slight colour change or shifting if exposed to UV emitting lighting sources
-
Rapid Refloor Pit Grout will exhibit a moisture reaction on damp or wet surfaces; repair area should be dry
-
USDA/FDA/LEED acceptable
-
Material should be dispensed at a moderate pace using steady pressure. Keep a waste container (disposable cup) handy to dispense Rapid Refloor Pit Grout liquid at start of application, or if dispensing is delayed for more than 45 seconds (to avoid cured material in mixer tip). Keep cartridge and gun pointed down at all times during dispensing to avoid cross-contamination resulting from flow back into cartridge
-
Apply material generously on the floor and work into the surface using a metal smoother, rigid edged trowel or screeding device. Monitor surface for air holes resulting from entrapped air and re-apply as needed. In some cases, more than one coat will be required for best results. If two coats are desired, first coat should be ground off prior to installing a second coat
-
Safety Data Sheet | SDS
Download PDFTechnical Data Sheet | TDS
Download PDFVisit Metzger McGuire's website
Visit website