METZGER/McGUIRE Products
Crack Repair Cartridges
Rapid Refloor Cartridges
Repair Concrete Defects like Bolt Holes and Pop OutsProduct Quantity | 250 ml | 600 ml |
Colours | Standard Grey |
Pot Life | 3.5-4 Minutes |
Dry Time | 1-1.25 Minutes Gel Time | 5-8 Minutes TF | 15-30 Minutes FT | 25 Minutes Grind | 60-120 Minutes FT, FC |
SF Or LF | 100 LF |
Area Or Depth | 3/8" x 1/2" /gal |
Floor Or Wall | Floors |
Interior or Exterior | Interior |
Compressive Strength (PSI) | 4190 |
Tensile Strength | 4300 |
Shore Hardness | D70-75 |
TF | Tack Free |
RC | Recoat |
FT | Foot Traffic |
LT | Light Traffic |
DT | Dry Through |
FC | Full Cure |
-
Permanent, durable structural concrete repair in minutes
-
Rapid Refloor’s low-viscosity allows for penetration into cracks as narrow as 1/64” (.016” or .40 mm)
-
Unlike many low-viscosity structural repair products, Rapid Refloor is virtually odourless. Rapid Refloor contains no VOC’s (0%) and is fully compliant with USGBC® LEED v4.1 green building standards. Use only in well ventilated areas
-
Rapid Refloor is non-hazardous and can be shipped overnight by air carrier
-
Rapid Refloor is a structural repair product and should not be used as a floor joint filler
-
Rapid Refloor is a structural repair product with very high adhesive and tensile properties; consequently it will restrain concrete movement wherever placed and may lead to concrete tearing if substantial concrete movement occurs after placement
-
Rapid Refloor is not designed for use in temperatures below 32°F (0°C)
-
Rapid Refloor overfill may leave a light stain/shadow on some concrete surfaces
-
Rapid Refloor may exhibit a moisture reaction on damp or wet surfaces; repair area should be clean and dry
-
USDA/FDA/LEED acceptable
-
Material should be preconditioned to 70°-80°F (21°- 27°C) prior to use for best results. Material should be dispensed at a moderate pace using steady pressure. Keep a waste container (disposable cup) handy to dispense Rapid Refloor liquid at start of application or if dispensing is delayed for more than 30 seconds (to avoid cured material in mixer tip)
-
When sequencing product installation as part of a concrete grinding/polishing process, install prior to your last metal or transitional tooling step. Use the least aggressive tooling which successfully removes the product and avoids opening more air holes/voids in the floor surface. Best results are obtained by first grinding off or knocking down any excessive overfill with a cup grinder and medium grit finishing pad, that won't mar the surface. It is further recommended that grinding operations be delayed for 20 minutes or more after initial Rapid Refloor placement
-
Safety Data Sheet | SDS
Download PDFTechnical Data Sheet | TDS
Download PDFVisit Metzger McGuire's Website
Visit Website