ARDEX Products
Underlayments
ARDEX V 1200™
Self-Leveling UnderlaymentProduct Quantity | 50 lbs |
Colours | Grey |
Working Time | 10 Minutes |
Pot Life | 10 Minutes |
Dry Time | 2-3 Hours FT |
SF Or LF | 26 SF |
Area Or Depth | 1/4" Thick |
Floor Or Wall | Floors |
Interior or Exterior | Interior & Exterior |
Compressive Strength (PSI) | Day28 4500 |
TF | Tack Free |
RC | Recoat |
CG | Concrete Guard |
CD | Concrete Dressing |
FT | Foot Traffic |
LT | Light Traffic |
DT | Dry Through |
FC | Full Cure |
HFT | Heavy Foot Traffic (Forklift) |
VT | Vehicular Traffic |
FUT | Full Traffic |
-
Installs up to 1 1/4” (3.1 cm) in most applications (same as V-1000)
-
Install moisture-insensitive tile and stone after 6 hours, floor coverings (Carpet, vinyl sheet, vinyl tile, vinyl plank, rubber, linoleum): after 24 hours
-
Pourable or pumpable. Install moisture-insensitive tile and stone after 6 hours, most other floor coverings after 24 hours
-
Suitable Substrates: Concrete (structurally sound); Absorbent terrazzo on concrete†; Properly installed ARDEX moisture control systems on concrete: ARDEX MC™ RAPID, ARDEX PU 50™, ARDEX VR 98™; Other approved, non-porous materials on concrete†: Non-porous (non-absorbent) cementitious terrazzo; Ceramic, quarry or porcelain tiles; Epoxy coatings; Epoxy terrazzo; Non-water-soluble adhesive residue; Concrete treated with certain curing compounds.Must be sound, solid and well-bonded to underlying, structurally sound substrates
-
Recommended Tools: ARDEX T-1 Mixing Paddle • ARDEX T-10 Mixing Drum • 1/2” (12 mm) heavy-duty drill (min. 650 rpm) • appropriate measuring bucket • ARDEX T-4 Spreader • ARDEX T-5 Smoother • ARDEX T-6 Spiked Roller • cleated athletic shoes with non-metallic spikes
-
Pour the mix onto the floor. Spread with spreader. Immediately smooth the material with the smoother, or spike roll the material with the spiked roller. Work in a continuous manner during the entire self-leveling installation. Wear cleated athletic shoes with non-metallic spikes to avoid leaving marks in the liquid
-
Mat testing: Allow the installation to dry a minimum of 24 hours prior to mat testing in accordance with ASTM D4263. To do this, place a piece of heavy plastic or a smooth rubber mat down over a 2’ X 2’ area. After 24 hours, lift the barrier material and inspect for surface darkening. A darkened area indicates excessive moisture is still present, and further drying time is required. Repeat the above test at regular intervals until no darkening is observed
-
Safety Data Sheet | SDS
Download PDFTechnical Data Sheet | TDS
Download PDFVisit Ardex's Website
Visit Website