Call Us Today: (403) 569-6879

ARDEX Products

Underlayments

ARDEX V 1200™

ARDEX V 1200™

Self-Leveling Underlayment
Product Quantity 50 lbs
Colours Grey
Working Time 10 Minutes
Pot Life 10 Minutes
Dry Time 2-3 Hours FT
SF Or LF 26 SF
Area Or Depth 1/4" Thick
Floor Or Wall Floors
Interior or Exterior Interior & Exterior
Compressive Strength (PSI) Day28 4500
TF Tack Free
RC Recoat
CG Concrete Guard
CD Concrete Dressing
FT Foot Traffic
LT Light Traffic
DT Dry Through
FC Full Cure
HFT Heavy Foot Traffic (Forklift)
VT Vehicular Traffic
FUT Full Traffic
  • Installs up to 1 1/4” (3.1 cm) in most applications (same as V-1000)

  • Install moisture-insensitive tile and stone after 6 hours, floor coverings (Carpet, vinyl sheet, vinyl tile, vinyl plank, rubber, linoleum): after 24 hours

  • Pourable or pumpable. Install moisture-insensitive tile and stone after 6 hours, most other floor coverings after 24 hours

  • Suitable Substrates: Concrete (structurally sound); Absorbent terrazzo on concrete†; Properly installed ARDEX moisture control systems on concrete: ARDEX MC™ RAPID, ARDEX PU 50™, ARDEX VR 98™; Other approved, non-porous materials on concrete†: Non-porous (non-absorbent) cementitious terrazzo; Ceramic, quarry or porcelain tiles; Epoxy coatings; Epoxy terrazzo; Non-water-soluble adhesive residue; Concrete treated with certain curing compounds.Must be sound, solid and well-bonded to underlying, structurally sound substrates

  • Recommended Tools: ARDEX T-1 Mixing Paddle • ARDEX T-10 Mixing Drum • 1/2” (12 mm) heavy-duty drill (min. 650 rpm) • appropriate measuring bucket • ARDEX T-4 Spreader • ARDEX T-5 Smoother • ARDEX T-6 Spiked Roller • cleated athletic shoes with non-metallic spikes

  • Pour the mix onto the floor. Spread with spreader. Immediately smooth the material with the smoother, or spike roll the material with the spiked roller. Work in a continuous manner during the entire self-leveling installation. Wear cleated athletic shoes with non-metallic spikes to avoid leaving marks in the liquid

  • Mat testing: Allow the installation to dry a minimum of 24 hours prior to mat testing in accordance with ASTM D4263. To do this, place a piece of heavy plastic or a smooth rubber mat down over a 2’ X 2’ area. After 24 hours, lift the barrier material and inspect for surface darkening. A darkened area indicates excessive moisture is still present, and further drying time is required. Repeat the above test at regular intervals until no darkening is observed